Air supply to the workshop

Scope of Work:

  • Supply and installation of air system including compressed air vessel with
  • drain, dryer, filters and Transair piping with fittings
  • Connect the system to the existing air compressor

Work Duration:

  • 10 Weeks

Location:

  • Garraf Oil Field

Client:

  • PetronasCarigali Iraq Holding B.V