GROTH Storage Tank Valves (PVRV & PRV)
Scope of Work:
- Cleaning and change the spare parts of the PVRV & PRV valves of the Groth.
- Calibration and Re- Calibration of the Groth valves at site.
Work Duration:
- 2 weeks
Location:
- Zakho – Tawke
Client:
- DNO